The Stack, Bottom Up
Five layers, each with a function that cannot be moved:
|
No. |
Layer |
Function |
|
1 |
Purlin / rafter |
Structure and load path |
|
2 |
Breather membrane |
Water barrier that passes vapour |
|
3 |
Metal batten 67 × 21 |
Tile fixing plane and vent channel |
|
4 |
Tile |
Weather surface |
|
5 |
Ridge vent / eave closure |
Air in at the eave, out at the ridge |

Spacing By Tile
Batten spacing is set by the tile's own lap, then checked against snow load. Getting this wrong shows up as tiles that sit proud at the head lap, or a course that sags between supports.
- Read the tile's head lap from its data sheet, not from the last job
- Check the spacing against the local snow load
- Keep the fixing line on the batten centre, not on the edge
Three Mistakes On Site
Almost every leak on a new metal roof traces back to one of these:
- Membrane laid with the lap against the weather, so water runs into the joint
- Battens fixed through the membrane at the low point of a sag
- Eave closure omitted, leaving an open path for wind-driven rain
Evidence
- Layer stack drawing, numbered
- Batten spacing sheet by tile type
- Ventilation path detail: eave to ridge
- Three-error checklist with photographs
FAQ
Q1. What order are the layers?
Structure, membrane, batten, tile - with the vent path from eave to ridge.
Q2. How do I set spacing?
Tile head lap first, then check against local snow load.
Q3. Where does the membrane lap go?
Away from the prevailing weather - the opposite way is the classic leak.
Q4. Is a vent path mandatory?
Yes, or condensation forms on the underside of the sheet.

Get Layer Stack + Spacing
Download the layer stack and spacing sheet, then send the tile type for a spacing check against your snow load.