Built For Area, Not Detail
On 20,000 m² the economics are set by three numbers:
|
Parameter |
Value |
Effect on programme |
|
Rib / cover |
65 mm / 430 mm |
Fewer panels per m² |
|
Panel length |
Formed on site, >100 m |
No transverse laps to seal |
|
Minimum pitch |
1.5° (5%) |
Flat roofs stay in scope |
|
Custom width |
200–700 mm |
Match the purlin grid |
Solar In Phase Two
The most expensive mistake on a warehouse roof is a future PV array that needs holes. The 65 mm seam accepts clamps without perforating the panel, so a phase-two installation does not void the roof's watertightness - a decision worth making at design stage, not at handover.
- Clamp fixed to the seam upstand, no drilling
- Load path taken into the purlin, not the panel face
- Cable routes planned above the insulation, not through the sheet


Leak Accountability
On a large plane, a leak is usually traced to a penetration or a gutter, not the field seam. The package therefore ships with the penetration details and the gutter sections drawn for the actual building, plus an acceptance checklist the site manager signs before the scaffold comes down.
Evidence
- 65-430 sheet with pitch and cover data
- On-site forming record for long runs
- PV clamp compatibility detail (no perforation)
- Acceptance checklist for gutters and penetrations
FAQ
Q1. What pitch does it need?
1.5° (5%) minimum; below that, drainage becomes a design problem, not a panel problem.
Q2. Can solar be added later?
Yes - clamps grip the seam, the panel is not drilled.
Q3. How are long runs handled?
Formed on site, over 100 m, so there is no transverse lap to seal.
Q4. Who signs off the roof?
A written acceptance checklist covering gutters, penetrations and seam ends.

Send Footprint for Layout
Send the building footprint and the purlin grid; we return the panel layout, the run plan and the container estimate for the area.