Three Standard Build-Ups
The same panel sits on three sub-frames. The layers below change with the structure; the top two do not:
|
Layer |
Concrete structure |
Steel frame |
Timber structure |
|
Structural base |
Concrete slab / beam |
Steel frame |
Original timber beams |
|
Sub-frame |
Corner bracket + metal keel |
Z-shaped purlin |
Wooden keel |
|
Insulation |
Insulation layer |
Insulation layer |
Insulation layer |
|
Deck |
Concealed profiled steel deck |
Concealed profiled steel deck |
Timber baseboard + OSB |
|
Leveling |
Leveling steel plate |
Leveling steel plate |
Leveled at the keel |
|
Waterproofing |
Waterproof layer |
Waterproof layer |
Waterproof layer |
|
Acoustic |
Noise reduction net |
Noise reduction net |
Noise reduction net |
|
Fixing |
Specialized hanging bracket |
Specialized hanging bracket |
Specialized hanging bracket |
|
Finish |
Hidden self-locking panel |
Hidden self-locking panel |
Hidden self-locking panel |



The Bracket Carries The Load, Not The Seam
On a conventional standing seam, the seam is the fixing point: a clamp grips the folded rib, squeezes it, and holds the sheet by friction and jaw pressure. That concentrates force at the clamp, distorts the rib over time, and puts a steel jaw against a painted surface.
- The hanging bracket is fixed through the deck at a set pitch, under the rib - the load path is panel → bracket → deck → structure
- Force is distributed along the bracket line instead of being pinched at one point on the seam
- The bracket sits beneath the panel: no jaw touches the weather face, so the coating is not marked by clamping
- The interlock is formed in the profile - the panel edges hook, they are not compressed by an external tool
- Brackets and screws are 304 stainless, packed by ratio to the panel quantity


One Pass Per Seam, One Crew Per Run
Here is the installation guide for Rymor concealed standing seam roofing:
- Lay the first panel on the flat substrate.
- Place one fastener every 1 meter and secure with screws.
- Install the second panel, aligning the male and female interlocks in advance.
- Press firmly along the rib edge to complete the installation.
Where The Time Goes, And Where It Stops Going
Two comparisons decide the labour figure on a project:
|
Item |
Clamp-and-seam method |
Self-locking bracket method |
|
Fixing action |
Grip the rib, close the seam with a tool |
Press the hook by hand |
|
Equipment |
Seaming tool, power, trained operator |
None |
|
Point load |
Concentrated at the clamp jaw |
Distributed along the bracket line |
|
Paint contact |
Jaw against the coated rib |
No contact on the weather face |
|
Speed limit |
Set by the tool and the operator |
Set by the crew's walking pace |
|
Re-work risk |
Distorted rib, marked coating |
Unlatch and press again |
The SKU Behind The Panel
One profile family, so repeat orders and phased projects stay consistent:
|
Item |
Range |
Note |
|
Rib height |
35 mm |
Concealed interlock |
|
Cover width |
300–700 mm |
380 mm standard |
|
Panel length |
Unlimited |
No transverse joint |
|
Steel substrate |
AZ150 0.5 / 0.6 / 0.8 mm |
Polyester or PVDF |
|
Aluminium substrate |
Al-Mg-Mn 0.8 / 0.9 / 1.0 mm |
Coastal and severe exposure |
|
Hangers and screws |
304 stainless |
Packed by ratio |

Evidence
- Three construction drawings - concrete, steel frame, timber - layer by layer with the panel and bracket called out
- Bracket detail: hole pattern, pitch, fixing into each deck type
- Panel section drawing with the interlock geometry and cover width
- Panel schedule: piece count by run, trim list, hanger and screw count by ratio
- Packing list: bundles by length and by run, labelled to the drawing
FAQ
Q1. Which construction applies to my building?
Tell us the structural base - concrete, steel frame or timber - and we return the matching build-up drawing with the bracket type named.
Q2. Is a seaming machine needed?
No. The panel edge presses onto the bracket hook by hand; there is no secondary seaming operation.
Q3. What pitch does the profile allow?
From 5% - the interlock channel carries water to the eave; steeper pitches are the normal case.
Q4. Can a solar array be fixed later?
Yes. The array clamps to the rib with a bracket made for it; the panel is not perforated and the weather face stays intact.
Q5. Do you supply trims with the panels?
Gable, eave and ridge trim are cut to the same module and shipped with the panel schedule.

Send Structure for Build-Up Drawing
Send the structural base, the roof plan and the area. We return the matching construction drawing, the panel schedule with hanger and screw counts, and a container plan sized to the order.