How The Lock Actually Closes
Three moves, no equipment. This is the mechanism that makes the panel usable where a machine-folded roof simply cannot be built:
1. The male edge stands on the rib line, aligned to the batten.
2. The 304 stainless hanger is fixed under the rib with a 304 self-drilling screw.
3. The female edge is pressed down until the hook locks over the male edge - the seam is closed and the fastener is buried.

|
Characteristic |
Value |
What it means on site |
|
Rib height |
35 mm |
Enough upstand for 5% pitch and above |
|
Cover width |
300–700 mm (380 rec.) |
Fewer seams per roof plane |
|
Panel length |
Unlimited |
No transverse lap, no lap leak |
|
Locking force |
Hand pressure |
No machine, no power, no tooling |
|
Concealed parts |
304 stainless hanger + screw |
The parts you cannot see do not corrode |

What "Mechanical" Means Here
The word gets used for two different roofs. Both are mechanically fixed; only one needs equipment:
- Both close without piercing the weather surface - that is the common ground
- The difference is the tooling, not the waterproofing principle
|
Item |
This panel: mechanical interlock |
High-rib system: machine-seamed |
|
Closing |
Press the female hook over the male hook |
65 mm upstand folded by a power seamer |
|
Equipment |
None |
Seamer, power, trained operator |
|
Where it suits |
Remote sites, islands, small crews, low pitch |
Airports, long-span terminals, extreme uplift |
|
Evidence we supply |
Interlock cross-section + hanger schedule |
Fold record + load figures from the drawing |


Where This Panel Wins
The projects that choose the interlock are usually the ones where a seamer is not an option:
- Island and remote sites with no reliable power at the roof
- Crews of two or three without a specialist seamer operator
- Retrofit and re-roof work where access is tight
- Low-pitch roofs from 5%, and steep roofs as well
- Coated steel or aluminium substrate, with the coating named on the drawing


Evidence
- Interlock cross-section drawing with the hook engagement dimension
- Three-step installation sequence, photographed on site, no equipment in frame
- 304 stainless hanger and screw specification, with the grade marked on the packing list
- Catalogue statement: no specialised hemming machine, no secondary on-site seaming
- Substrate and coating named on the drawing: AZ150 steel or aluminium-magnesium-manganese
FAQ
Q1. Does this panel need a seaming machine?
No. The interlock closes by hand pressure; there is no machine, no power drop and no secondary forming at the rib.
Q2. Then how is it fixed down?
A 304 stainless hanger sits under the rib, screwed to the batten with a 304 self-drilling screw; the female hook closes over the male hook and buries the fastener.
Q3. Is sealant or adhesive used?
None. The interlock geometry and the built-in expansion gap provide the water path control.
Q4. How is it different from the high-rib system?
The high-rib 65 mm roof is folded with a power seamer for airport-scale uplift; this panel is pressed by hand for sites where that equipment is not available.

Get Interlock Spec + Quote
Send the roof plan, the wind zone and a note on what equipment your crew actually has. We reply with the interlock cross-section, the hanger schedule and a quote - no seamer required.