Metal Roof Panel Systems

Metal Roof Panel Systems

Terminals, exhibition halls and stadiums ask one thing of a roof: it must still be watertight after the fortieth storm and the thousandth thermal cycle. Our metal roof panel systems are the 65 mm high-rib line built for that duty — 430 mm cover, mechanical seam, panels formed on site so a run can pass 100 metres without a lap.

The 65-430 Panel, In Numbers

 

One model carries most of this work, and its numbers are fixed:

  • Substrate: AA3003 / AA3004 aluminium, 0.9–1.0 mm; AZ150 steel 0.5–0.8 mm on request
  • Finish: PVDF fluorocarbon, colour matched to the facade package
  • Curved and tapered: positive/negative arc down to 3 m radius; taper 230–600 mm
  • Solar-ready: the seam accepts PV clamps without drilling the panel

Parameter

Value

Note

Rib height

65 mm

The drainage wall that handles cloudbursts

Effective cover

430 mm

Custom width 200–700 mm available

Panel length

Over 100 m

On-site forming, no transverse lap

Minimum pitch

5%

Flat public roofs stay in scope

 

2

 

Why The Rib Height Matters At An Airport

 

Wind at a terminal perimeter is not the wind of a suburban roof. The 65 mm rib plus a mechanical fold gives the section the depth to resist uplift at the edge zone, while the standing seam itself becomes the drainage channel - water runs in the seam, not across the panel face, so a low pitch still drains in a downpour. That is the geometry that keeps this profile in terminal specifications.

  • Airtight, watertight seam: no fastener penetrates the weather surface.
  • Thermal movement absorbed by the seam, not by the fixings.
  • On-site forming removes the lap that normally fails first.
  • Machine-seamed system: the press-fit self-locking clasp panel is a separate product and needs no seaming machine at all.
3

 

From Tender Drawing To Container

 

Public work is decided on paper, so our process is paper-shaped:

1. Send the roof plan, wind zone and code reference (PDF drawings accepted).

2. We return the panel layout, seam type, flashing schedule and a take-off.

3. Fixed quote against that take-off - MOQ 200 m² per project.

4. Labelled containers, item by item against the take-off, so the site starts without sorting.

product-754-584
product-754-584
product-754-584
product-754-584
product-754-584
product-754-584

 

Evidence

 

  • 65-430 specification sheet with rib, cover and thickness
  • On-site forming record: panel runs over 100 m, no lap
  • Curved and tapered geometry samples (3 m radius, 230–600 mm taper)
  • Public facility references: terminal, exhibition, stadium
5
5

 

FAQ

 

Q1. What is the minimum order?

200 m² per project - configured to your drawing, quoted against the take-off.

Q2. Can you form panels on site?

Yes. On-site forming is standard for this line, which is how runs exceed 100 m without a lap.

Q3. How flat a roof can it take?

1.5° (5%) minimum pitch, with the seam acting as the drainage channel.

Q4. Is it solar-ready?

Yes - PV clamps grip the seam, so the panel stays unperforated.

 

modular-1
Send Plan for Layout + Quote

Send the roof plan and the design wind pressure; you receive the panel layout, seam specification, flashing schedule and a quote at the 200 m² MOQ.

 

Hot Tags: metal roof panel systems, China metal roof panel systems suppliers, factory

Send Inquiry